A water-resistive barrier inspection is added to all additions, new residences, and commercial buildings.
House wrap will require one inspection after the windows and/or doors are installed. The installation instructions for the product being used must be on-site at the time of inspection.
The zip wall system will require two inspections:
- Nailing of the sheathing (shear inspection)
- Taping of the seams
This will be inspection order number 10 and will be performed just before the exterior covering is installed. Partial inspections can be done for a minimum of two walls.